Skip To Main Content

Utility Nav Mobile

Toggle Close Container

Mobile Main Nav - District

Header Holder

Announcements Banners

No post to display.

Header Top

Container BTN

Translate

Toggle Menu Container

Toggle Search Container

Header Bottom

Header Bottom Left

Header Bottom Right

Utility Nav Desktop

Header Sticky

Container BTN

Translate

Toggle Menu Container

Toggle Search Container

Canvas Container Wrapper

Schools Canvas

Close Canvas Menu

Our Schools

Search Canvas

Close Canvas Menu

Icons Nav

Roof Replacement (2017 Bond)

May 2017 Bond - Roof/Seismic Projects

Sitton Roof before
New Roof at Sitton

Mt. Tabor Roof

Mt Tabor Middle School (Completed 2020)
Roof/Seismic w/ Fall Protection -
Partial re-roof of the school building. All components approximately 50% of the school's roof will be replaced including skylights, flashings and sheet metal, with seismic upgrades including parapet bracing strengthening roof decks and improving roof to wall connection. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

Kelly Roof

Kelly Elementary School (Completed 2020)
Roof/Seismic w/ Fall Protection -
Partial re-roof of the school building and annex. All components approximately 50% of the school's roof will be replaced including skylights, flashings and sheet metal, with seismic upgrades including parapet bracing strengthening roof decks and improving roof to wall connection. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

Woodlawn Roof
>

Woodlawn PK-5 School (Completed 2020)
Roof/Seismic w/ Fall Protection -
Partial re-roof of the school building and annex. All components approximately 50% of the school's roof will be replaced including skylights, flashings and sheet metal, with seismic upgrades including parapet bracing strengthening roof decks and improving roof to wall connection. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

Harrison Park Roof

Harrison Park K-8 School (Completed 2020)
Roof/Seismic w/ Fall Protection -
Partial re-roof of the school, including replacement of 5 deteriorated air handling units as well as science greenhouse skylights.  We also provided some minor ADA upgrades to one set of student restrooms.  In addition, we installed new roof ladders and hatch. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

Ockley Green Roof

Ockley Green Middle School (Completed 2020)
Roof/Seismic w/ Fall Protection -
Partial re-roof of the school building, approximate 60% re-roof including the administration, library, mechanical room, kitchen, dance and gymnasium area.  This included installation of new roof drains and skylights at the library as well.  In addition, we replaced all stair handrails and provided ADA compliant upgrades to a set of restrooms. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

Rigler Roof

Rigler Elementary School (Completed summer 2019)
Roof/Seismic w/ Fall Protection -
Roof and seismic upgrade will include all areas of the roof except for the two newer portable buildings.  All components of the roof will be replaced included skylights, flashings and sheet metal, with seismic upgrades including parapet bracing strengthening roof decks and improving roof to wall connection. The unreinforced masonry chimney was also removed. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

Sitton Roof

Sitton Elementary School (Completed summer 2019)
Roof/Seismic w/ Fall Protection -
Roof and seismic upgrade will include all areas of the roof except for the two newer portable building.  All components of the roof will be replaced included skylights, flashings and sheet metal, with seismic upgrades including parapet bracing strengthening roof decks and improving roof to wall connection. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

Beverly Cleary Fernwood Roof

Fernwood – Beverly Cleary K-8 School (Completed fall 2018)
Roof/Seismic w/ Fall Protection -
The roof/seismic upgrades include all roof areas due to their deteriorating conditions. The roof assessment was based on direct observations and the 2011 Professional Roof Consultants roofing assessment report provided by Portland Public Schools. All components of the roof will be replaced including skylights, flashing, sheet metal, and gutters, with seismic upgrades including parapet bracing strengthening roof decks and improving roof to wall connection.   All portions of the roof will have installed OSHA-compliant fall protection on equipment, with new roof hatches, and new fixed ladders.

MLK Jr Roof

Martin Luther King Jr. School (Completed summer 2018)
Roof/Seismic w/ Fall Protection -
The roof/seismic upgrades include all roof areas, except for the MLK Jr. Community Annex. The complete roof assessments are still required by the design firm.  All components of the roof will be replaced included skylights, flashings and sheet metal, with seismic upgrades including parapet bracing strengthening roof decks and improving roof to wall connection.  All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

Jackson Roof

Jackson Middle School (Completed summer 2019)
Roof/Seismic w/ Fall Protection - 
The roof/seismic upgrades include all roof areas, except those recently reroofed (2009), due to their deteriorating conditions. The roof assessment was based on direct observations and the 2008 Professional Roof Consultants roofing assessment report provided by PPS. All components of the roof will be replaced including flashing, sheet metal, and scuppers, with seismic upgrades including parapet bracing strengthening roof decks and improving roof to wall connection.  The unreinforced masonry chimney will also be removed. All portions of the roof will have installed OSHA-compliant fall protection on equipment, with new roof hatches, and new fixed ladders.

 

ROOF PROJECTS BAC STATUS REPORTS
BAC Health & Safety:Roof Projects Status November 2023

For more information about PPS roof/seismic projects please email: schoolmodernization@pps.net