-
Madison High School Modernization Project
Click play below to watch the virtual reality fly-through of the entire Madison High School campus that will be completed for the fall of 2021:
Madison High School is one of 3 PPS high schools being modernized or rebuilt through the successful May 2017 Bond. It was master planned as part of the 2012 School Building Improvement Bond. The goal of planning and design is to develop comprehensive, equitable, integrated and visionary high school campus concepts with authentic school community engagement.
The master planning for the Madison Campus began in February 2016 and was completed in June 2016. A Design Advisory Group (DAG) has been formed to help Madison move through the next phase of planning and design. Construction will begin in the summer of 2019.
CLICK HERE to get connected, get involved, and stay informed on all things Madison High School Modernization Plan. The details of the transportation plan are included there as well.
Click the links below for 360 degree Virtual Tours of the Madison High School Modernization:
South Entrance / Stadium: http://mhs360-1.opsisarch.com/
South Entrance & Parking Lot: http://mhs360-2.opsisarch.com/
Interior of South Entrance: http://mhs360-3.opsisarch.com/
Main Gym: http://mhs360-6.opsisarch.com/
Auxiliary Gym: http://mhs360-4.opsisarch.com/
Between the gyms: http://mhs360-5.opsisarch.com/
Sun Space: http://mhs360-7.opsisarch.com/
Main entrance (east side): http://mhs360-8.opsisarch.com/
Interior of the main entrance: http://mhs360-9.opsisarch.com/
Cafeteria: http://mhs360-10.opsisarch.com/
Cafeteria (alternative view): http://mhs360-11.opsisarch.com/
North Entrance: http://mhs360-12.opsisarch.com/
Media Center / Library: http://mhs360-13.opsisarch.com/
The Beacon (Science Flex): http://mhs360-14.opsisarch.com/
Main Office: http://mhs360-15.opsisarch.com/
Typical classroom: http://mhs360-16.opsisarch.com/
Science Classroom: http://mhs360-17.opsisarch.com/
Courtyard: http://mhs360-18.opsisarch.com/
Classroom: http://mhs360-19.opsisarch.com/
Theatre: http://mhs360-20.opsisarch.com/
South Parking Lot: http://mhs360-21.opsisarch.com/
Cafeteria view from the Sky Bridge: http://mhs360-22.opsisarch.com/
East Hallway 2nd floor: http://mhs360-23.opsisarch.com/
Theatre (view from Theatre Balcony): http://mhs360-24.opsisarch.com/
Interior Courtyard: http://mhs360-25.opsisarch.com/